Files
SentryAgent.ai Developer 8cabc0191c docs: commit all Phase 6 documentation updates and OpenSpec archives
- devops docs: 8 files updated for Phase 6 state; field-trial.md added (946-line runbook)
- developer docs: api-reference (50+ endpoints), quick-start, 5 existing guides updated, 5 new guides added
- engineering docs: all 12 files updated (services, architecture, SDK guide, testing, overview)
- OpenSpec archives: phase-7-devops-field-trial, developer-docs-phase6-update, engineering-docs-phase6-update
- VALIDATOR.md + scripts/start-validator.sh: V&V Architect tooling added
- .gitignore: exclude session artifacts, build artifacts, and agent workspaces

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-07 02:24:24 +00:00

36 lines
1.3 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# OpenSpec Proposal — phase-7-devops-field-trial
**Status:** Approved
**Proposed:** 2026-04-04
**Approved by:** CEO
## Problem Statement
The existing `docs/devops/` was written during Phase 2 (archived 2026-04-02). Phases 36 added
substantial new infrastructure — 14 new DB migrations, Phase 6 feature flags, Stripe integration,
new services (Analytics, Tier, Compliance, A2A), and the Next.js portal — none of which are
reflected in the current DevOps documentation.
Additionally, the team is preparing for in-house Docker Compose field trials and has no
deployment execution guide.
## Proposed Solution
**WS1 — Update Existing DevOps Docs**
Audit and update all files in `docs/devops/` to reflect the current Phase 6 state of the
codebase. Every env var, migration, service, and port must be accurate.
**WS2 — New In-House Field Trial Guide**
Create `docs/devops/field-trial.md` — a step-by-step execution playbook covering:
- Phase A: Stack startup verification
- Phase B: Core product end-to-end journeys
- Phase C: Security guardrails and tenant isolation
- Phase D: Next.js portal verification
- Phase E: AGNTCY conformance suite against live environment
- Phase F: Performance baseline
## CEO Approval
Approved 2026-04-04 per CEO directive: "YES Approved per CTO recommendations — implement your
plan per Openspec Protocol"